SYNOPSIS OF PROFESSIONAL EXPERIENCE


Over two ( 12 ) years of experience in the field of Engineering, Project Managemenet, Engineering System QA/QC Inspection, Design, Drafter, Fabrication & Erection, Contruction field supervision, d commissioning relating to LPG Plan, Oil & Gas both onshore & offshore, Involved in a vast aspect of work in industry of oilfield such as piping, jackets and platforms, Wellhead Equipment, Pipeline, Pressure vessel, Oil Tank, Heat exchanger, Tank Saparator, Steam Scrubber, Boiler & Factory Building . One Year my experience in Waste water for Drainage Pump, Sewage pump, Booster Pump, Fire Pump Protection Plan, Flood Control & Supervise for Fabrication, Erection, testing, Comissioning project & Etc. 

EMPLOYMENT RECORD


2009 – 2013                                         PT. BETA PRAMESTI

Line Bussiness : Plant Design Engineering, Rehabilitation, Project management for Water &  Wastewater Treatment/Recycle, SWRO, BWRO,  Tank Manufacturing, Other Equipment

                                                                Office:   ( Jakarta, Jambi, Surabaya, Samarinda, Banjarmasin)
                                                               
As : Design Engineer, Project Manager, PPIC

Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project; PV Elite; Caesar II, API Tank 2000
                                       
Responsible for direct oversight/management of project Design, Calculating, Drawing, planning, scheduling development and progress control. Review, Estimate, supervise project control for Piping, Vessel & Tank and automation System for Piping Equipment.

Client     :               PT. Wijaya Karya - Jakarta
PT. Adhi Karya - Jakarta
PT. Rekadaya Electrika -  Jakarta
PT. Indah Kiat Pulp & Paper - RIAU
                                PT. JAYA TEKNIK ANCOL - Jkt
PT. MAHAKAM BETA FARMA - Jkt
PT. RAKAYASA INDUSTRI - Jkt
PT. DANKOS FARMA - Jkt
PT. SULFINDO ADI USAHA - Merak
PT. ANDALAN FURNINDO Sugar Refinery - Jkt
PT. SARANA USAHATAMA JAYA - Cilegon
PT.TRIPATRA–PERTAMINA SAMTAN-Palembang
PT. PERNADI- PERTAMINA UBEP ADERA - Palembang

PT. NAGAMAS – TOYOTA MOTOR           MANUFACTURING INDONESIA - Karawang
PT. LONTAR PAPYRUS PULP & PAPER –  TAnjung  Jabung-Jambi
PT. SOCI MAS - Medan




Project :
-   Demineralization Plant ( Design/ Project Control ) 
   For PT. Indah Kiat Pulp & Paper – 3 x 250 m3/h
-   Brakish Water Reverse Osmosis-BWRO   
   ( Design/ Project Control ) For PT. Indah Kiat Pulp & Paper – 1 x 250 m3/h
-   Condensate Polisher Unit ( Design/Project Manager ) For PT. Lontar Papyrus -250m3/h
-   Condensate Polisher Unit ( Design/Project Manager )
    For PT. Sulfindo Adi Usaha 2 x 56m3/h

-   Water Treatment Plant ( Design/Project Control) 
    For PT. Andalan Furnindo
-   Decolourization  For PT. Andalan Furnindo
-   Purified Water EDI+RO ( As :Design/Project Manager )
   For PT. Dankos Farma
-   Purified Water EDI+RO (( As :Design/Project Manager ) For PT. Mahakam Beta Farma
-   Reverse Sea Water Reverse Osmosis as: Design/Draft ) For PT. Jaya Teknik Ancol
SWRO cap. 5000/Day
-   Ect.

Make Plant design for Tank, Pressure Vessel & Piping, Support,  as per Costumer & contract  Project neended. Before Bidding we must prepare all neended requirement include Plant Drawing Process, Lay out & Data Material. Preparation for Calculation & Designed, Drawn material construction like Vessel, tank, Pipe, Isometric Piping, Support by my self. We will just supervising, Control for fabrication & Instalation than Testing Comissioning. Mechanical, Piping & Vessel Trainer at PT. Beta Pramesti


October 2006 – 2009                         PT. ION EXCHANGE Asia Pacific Pte.Ltd
Line Bussiness : Plant Design Eng, Rehabilitation, Project management for Water &  Wastewater Treatment/Recycle.
                                                                Office:   ( Singapore- Malaysia-Pekanbaru- Jakarta )
                                                               
As : Mechanical Design/Drafter.  ( Tank & Pipework, Civil Etc.)
Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project; PV Elite; Caesar II
                                      
Responsible for direct oversight/management of project C alculation & Design, Drawing, planning, scheduling development and progress control. Review, Estimate, supervise project control for Piping, Vessel & Tank and automation System for Piping Equipment.

Client     :               PT. Riau Andalan Pulp & Paper- RIAU
                                PT. Indah Kiat Pulp & Paper - RIAU
                                PT. SINAR SINYO KIMIA
PT. AJINOMOTO- SURABAYA
PT. RAKAYASA INDUSTRI
PT. INDO BARAT RAYON

Project :
-   Demineralization Plant ( Design/Draft ) For PT. Indah Kiat Pulp & Paper – 6 x 150 m3/h
-   Demineralization Plant ( Design/Draft ) For PT. Indo Bharat rayon-100m3/h
-   Demineralization Plant ( Design/Draft ) For PT. Riau Andalan Pulp & Paper
-   Demineralization Plant ( Design/Draft ) For PT. Rekayasa Industri-Geothermal plant Project.
-   Filtration plant ( Design/Draft ) For PT. Sumatera Timber
-   Filtration + Softening plant ( As :Design/Draft ) For PT. Elegant Textile
-   Reverse Osmose plant (As:Design/Draft ) For PT. Essar Indonesia
-   Reverse Osmose-Demin plant as: Design/Draft ) For PT. Menamas ( PLTU Medan —Indonesia)
-   Ect.

Make Plant design for Tank, Pressure Vessel & Piping, Support,  as per Costumer & contract  Project neended. Before Bidding we must prepare all neended requirement include Plant Drawing Process, Lay out & Data Material. Preparation for Designed, Drawn material construction like Vessel, tank, Pipe, Isometric Piping, Support by my self. We will just supervising for fabrication & Instalation than Testing Comissionin g.
Feb 2005 – Sept  2006                        Torishima Guna Engineering
Line Bussiness : Engineering ,Procurement, Contractor for  Pump & Engineering System.
Office : (Jakarta- Bali )
Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project;


As : Designer, Drafter & BOM, BOQ Supervisor for    Mechanical Project.-
( Permanent Contract Status) - Resign
                                                                 
Responsible for direct oversight/management of project planning, scheduling development and progress control. Review, Design, Drawing, Estimate, supervise project control for pumping Station such as Water Level Control (WLC), Coupled Pump with engine & Coupled Pump With Electro Motor, NPSH, Cavitation , Loss Head.

Client     :               PT. WASKITA KARYA, ( DSDP ) -AWT
                                PT. ADHI KARYA, ( DSDP ) -AWT
                                PT. TOKURA, ( DSDP ) -AWT
PACIFIC CONSULTAN .( DSDP ) -AWT
PU JAKARTA
PU NANGROE ACEH DARUSSALAM
PT. PUSRI – PALEMBANG
PT. MLD ( Mitra Lingkungan Duta. Consult )
PDAM – JAKARTA
PDAM – KALIMANTAN TIMUR
Project :
-       ( Denpasar Sewerage Development Project / DSDP ). 2005 – 2006.
-   FIRE PUMP- PLTG GUNUNG MAGANG(  Sum – Sel.

-       DRAINAGE PUMP PROJECT, TELUK GONGJakarta
-       DRAINAGE PUMP PROJECT, WADUK MELATI- Jakarta
-       WATER THREATMENT PROJECT-KUTAI . Sangatta ( Kalimantan Timur ).                                                                           
-          WATER THREATMENT PROJECT-Samarinda -  Kalimantan Timur
-  FLOOD CONTROL PUMP PROJECT, MuslimAID- SAUDI ARABIA- Aceh 
                                                                                            -       Flood Control Pump PANTAI INDAH KAPUK .
                                                                                            -       Etc.
In designing different each project to Promote our Pump Product for  application in Water system. Design for Denpasar Sewerage  Development Project at Kuta & Sanur for Pumping Station  11 m³/s, 90kW, head 28m & 6.2m³/s,37kW Head 18m complete with wetpit pump installation as Public sewage collected and Pipeline from wetpit  to Pump station . Selection pump for other application, complete with Boster tank for storage, jockey pump for fire protection ( NFPA std ). Supervise while installation for make sure Asbulit Drawing and commissioning for testing. Application crane for lifting pump in Pump station for service & remove heavy Weight Equipment. Estimation for Bill of Quantity and Bill of Material make sure project really cost Sangatta-Ptorject, Samarinda-Project, to Identify material to installation and erection each process control. To make design fabrication Pipe non standar larger & tank for reservoir sangatta-Project & Pantai Indah Kapuk.




Des 2003 – Feb 2005                         PT. PIMSF Oil & GAS Division (TJOKRO GROUP) – INDONESIA
Line Bussiness : Assymbyg, Repair Service, Product Wellhead Equipment System & Pipework.
Office : Kapuk-Tangerang   ( Indonesia )
Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project; Inventor Series 6; Adobe Photoshop


As : Engineering ( Permanent Contract Status) - Resign


In relation to quality and the Quality System for direct oversight/management of project planning, scheduling development and progress control. Review, Design, Drawing, Estimate, supervise project control, inspected with hardness test, ultrasonic test for testing material and test assembling report with NACE MR 0175-2002  for corrosive ressistance, API spec 6A, API spec 14D, ASME standard.

                                                                Client     :  PT. APEXINDO PRATAMA DUTA Tbk (MEDCO) –                                                                             INDONESIA
   PT. DRILLCO JAYA ABADI
   PT. CONOCO PHILLIPS
Project   :  Wellhead Equipment (EPC)
                                                                                   Pipeline /Piping
                                                                                 
EPC of  fourteen (14) Choke and Kill Manifold, DSA 13 5/8”5M x 7 1/16”3M RTJ, tubing head, tubing hanger, six (6) BOP test flange complete with skid, six (6) 13 -5/8” 10,000 PSI SL BOP Stack, two (2) complete unit of Koomey BOP control system as per API standard. Manage the repair of Annular flange and other wellhead parts as per API standard. As Hydrotest & Gas Test for Leakage of  Control Valve above 10,000 PSI for Kill & Line Manifold, Elmaoco Brake and Wellhead Equipmet.


Dec 2003 – June 2004                 PT. PIMSF (TJOKRO GROUP) – INDONESIA

Line Bussiness : Tank, Presure Vessel, Construction, Insfrastructure, Assymbling, Repair, Service, Product Wellhead Equipment System & Pipework/piping.

Office : Kapuk-Tangerang   ( Indonesia )

Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project; Inventor Series 6; Adobe Photoshop


As : Engineering Staff ( Planner & Drafter ) - 6 month Contract Status)

Responsible for direct oversight/management of project planning, scheduling development and progress control. Review, Design, Drawing, Estimate, supervise project control, inspected with hardness test, ultrasonic test for testing material with ,JIS, API, ASME standard and approves purchase technically. Promote project team’s awareness and importance of identifying early task slippage and use of the critical path method to gain the best performance to plan. Identify the change order and prepare the variation of order for approval.

Client     : 
                   PT. HAMADA 
   PT. SEAMEC ASIA
   PT. IKPT
   PT. DIC GRHAPIC
Project   : LNG BONTANG TRAIN H,( IKPT) 
                                                                                  PDAM Bontang ( Water Treathment Process)
,( ENVITEC)
                                                                                  HAMADA BOILER( PT. Pindo Deli Pulp Paper)    
  DIC GRAPHIC EXPANSION PROJECT
Fabricated and various component for mechanical project, 934 Pipe Support, 4 Water Treathment Proccess Tank, 1 Factory platform, Resin Tank, Mixer Tank Piping Lay Out design,Factory Expansion, piping, Coal Fire Boiler.


Sept 2003 - Dec 2003                   PT. Hitachi Construction Machinery  Indonesia ( HCMI )
         INDONESIA
Line Bussiness : Product, Assymbly, Repair Service, Boiler & Equipment System of Hitachi Boiler.
Office/Workshop : Cibitung -Bekasi  ( Indonesia )

Software Aplication : AutoCAD 2D/3D, Auto Pipe, MS Project;

As : Boiler Maker & Material Control  - (  Contract Project Status )

Responsible for direct oversight/management of project planning, scheduling development and progress control. Review  instruction , supervise project control, with ASME VIII Division 1 & 2, ASME IX, & AWS, API and ASTM standard and approves fabricate technically. Promote project team’s awareness and importance of identifying early task slippage and use of the critical path method to gain the best performance to plan. Identify the drawing code (Welding & joint code), cutting plan  material  and prepare the Welding Procedure ( WPS, PQR,WPQ )  for approval.

Client     :     PT. Rosalia Textindo, Bekasi
Project   : Fabrication for Coal fire Boiler 10 TPH
                                                                                 
Furnace of boiler, Chimney, Membrane tube, Smoke tube, Tank , Equipment, thermocouple, air inlet control system as per finish good complete. Manage the fitt up & joint welding, rolling process, Bending process of all tubing, wall body tank and adjustable proccess of work allowe time & target schedule as per Drawing standard. Control to material handling and pass reposition place with first safety target for man, material,Equipment & Area (HSE).

May20th 2003 – August30th 2003   PT. GERBANG SARANA BAJA – INDONESIA

Office/Workshop : Tipar Cakung-Jakarta Timur   ( Indonesia )

Software Aplication : AutoCAD 2D/3D, MS Project;

                                                                As : Forman, QA/ QC (  Contract 1 Year Status )

Manage to  project planning, control material and testing standar approval working procedure allowable ASME, AWS,API standard. Correction to design actuality on fabrication process and instructing for  operator in safety Health in working area 
Client     : 
                   PT. PERTAMINA
   PT. REKAYASA INDUSTRI
   PT. YUDISHTIRA HAKA  PERKASA
Project   : Fabrication  Pressure Vessel/ HeatExcanger  
                                                                                  for Mini LPG PLAN Cilamaya, West Java
                                                                 
to fabrication pressure vessel C-300, C400, 3 Steam Scrubber vessel,  stiffener ring, odd tray, even tray and platform that working pressure 416.6 PSIG allowed system as per ASME VIII section 2 for fabrication in joint efficiency 100% radiogrhapy. Manage the body shell tank of pressure vessel with parts as per ASME code and welding code. As Hydrotest & Leakage of  above 1,000 PSI for all welding joint.

1996 – 1998                               As : Field Mechanical Operator, Pipe Fitter; Formen in any Project ( Status As per Project )

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...: Menerima : Design & Drawing Water Treatment Plant, Brakish Water Reverse Osmosis, Sea Water Reverse Osmosis,  Demineralization, S...

Water Treatment Plant; Sea Water Reverse Osmosis; Demin Plant System: DESIGN SEA WATER REVERSE OSMOSIS

Water Treatment Plant; Sea Water Reverse Osmosis; Demin Plant System: DESIGN SEA WATER REVERSE OSMOSIS: KAMI BERPENGALAMAN Kami siap membantu Konsultasi untuk Proyek Anda (Industri dan Rumah Tangga ): SeaWater Reverse Osmosis...

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...: Menerima : Design & Drawing Water Treatment Plant, Brakish Water Reverse Osmosis, Sea Water Reverse Osmosis,  Demineralization, S...

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...

Design Engineer: Waste Water Treatment Plant Water Treatment Plant,...: Menerima : Design & Drawing Water Treatment Plant, Brakish Water Reverse Osmosis, Sea Water Reverse Osmosis,  Demineralization, S...