Contact Phone : 08121901551
SYNOPSIS OF PROFESSIONAL EXPERIENCE
Over
two ( 12 ) years of experience in the field of Engineering, Project
Managemenet, Engineering System QA/QC Inspection, Design, Drafter, Fabrication
& Erection, Contruction field supervision, d commissioning relating to LPG
Plan, Oil & Gas both onshore & offshore, Involved in a vast aspect of
work in industry of oilfield such as piping, jackets and platforms, Wellhead
Equipment, Pipeline, Pressure vessel, Oil Tank, Heat exchanger, Tank Saparator,
Steam Scrubber, Boiler & Factory Building . One Year my experience in Waste
water for Drainage Pump, Sewage pump, Booster Pump, Fire Pump Protection Plan,
Flood Control & Supervise for Fabrication, Erection, testing, Comissioning
project & Etc.
EMPLOYMENT RECORD
2009
– 2013 PT. BETA PRAMESTI
Line Bussiness : Plant
Design Engineering, Rehabilitation, Project management for Water & Wastewater Treatment/Recycle, SWRO,
BWRO, Tank Manufacturing, Other Equipment
Office: ( Jakarta, Jambi, Surabaya, Samarinda,
Banjarmasin)
As : Design Engineer,
Project Manager, PPIC
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project; PV Elite; Caesar II, API Tank 2000
Responsible for direct oversight/management of
project Design, Calculating, Drawing, planning, scheduling development and
progress control. Review, Estimate, supervise project control for Piping,
Vessel & Tank and automation System for Piping Equipment.
Client : PT. Wijaya Karya - Jakarta
PT. Adhi Karya - Jakarta
PT. Rekadaya Electrika - Jakarta
PT. Indah Kiat Pulp & Paper - RIAU
PT. JAYA TEKNIK
ANCOL - Jkt
PT. MAHAKAM BETA FARMA - Jkt
PT. RAKAYASA INDUSTRI - Jkt
PT. DANKOS FARMA - Jkt
PT. SULFINDO ADI USAHA - Merak
PT. ANDALAN FURNINDO Sugar
Refinery - Jkt
PT. SARANA USAHATAMA JAYA -
Cilegon
PT.TRIPATRA–PERTAMINA
SAMTAN-Palembang
PT. PERNADI- PERTAMINA UBEP
ADERA - Palembang
PT. NAGAMAS – TOYOTA MOTOR MANUFACTURING INDONESIA - Karawang
PT. LONTAR PAPYRUS PULP &
PAPER – TAnjung Jabung-Jambi
PT. SOCI MAS - Medan
Project :
- Demineralization Plant ( Design/ Project Control )
For PT. Indah Kiat
Pulp & Paper – 3 x 250 m3/h
- Brakish Water Reverse Osmosis-BWRO
( Design/ Project Control ) For PT. Indah Kiat Pulp & Paper – 1 x 250 m3/h
- Condensate Polisher Unit ( Design/Project Manager ) For PT. Lontar
Papyrus -250m3/h
- Condensate Polisher Unit ( Design/Project Manager )
For PT. Sulfindo
Adi Usaha 2 x 56m3/h
- Water Treatment Plant ( Design/Project Control)
For PT. Andalan
Furnindo
- Decolourization For PT. Andalan
Furnindo
- Purified Water EDI+RO ( As :Design/Project Manager )
For PT. Dankos
Farma
- Purified Water EDI+RO (( As :Design/Project Manager ) For PT. Mahakam
Beta Farma
- Reverse Sea Water Reverse Osmosis as: Design/Draft ) For PT. Jaya
Teknik Ancol
SWRO cap. 5000/Day
-
Ect.
Make Plant design for Tank, Pressure Vessel & Piping, Support, as per Costumer & contract Project neended. Before Bidding we must
prepare all neended requirement include Plant Drawing Process, Lay out &
Data Material. Preparation for Calculation & Designed, Drawn material
construction like Vessel, tank, Pipe, Isometric Piping, Support by my self. We
will just supervising, Control for fabrication & Instalation than Testing
Comissioning. Mechanical, Piping & Vessel Trainer at PT. Beta Pramesti
October 2006 – 2009 PT. ION EXCHANGE Asia Pacific Pte.Ltd
Line Bussiness : Plant
Design Eng, Rehabilitation, Project management for Water & Wastewater Treatment/Recycle.
Office: ( Singapore-
Malaysia-Pekanbaru-
Jakarta )
As : Mechanical
Design/Drafter. ( Tank & Pipework,
Civil Etc.)
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project; PV Elite; Caesar II
Responsible for direct oversight/management of
project C alculation & Design, Drawing, planning, scheduling development
and progress control. Review, Estimate, supervise project control for Piping,
Vessel & Tank and automation System for Piping Equipment.
Client : PT. Riau Andalan Pulp & Paper- RIAU
PT. Indah Kiat Pulp & Paper - RIAU
PT. SINAR SINYO
KIMIA
PT. AJINOMOTO- SURABAYA
PT. RAKAYASA INDUSTRI
PT. INDO BARAT RAYON
Project :
- Demineralization Plant ( Design/Draft ) For PT. Indah Kiat Pulp &
Paper – 6 x
150 m3/h
- Demineralization Plant ( Design/Draft ) For PT. Indo Bharat rayon-100m3/h
- Demineralization Plant ( Design/Draft ) For PT. Riau Andalan Pulp &
Paper
- Demineralization Plant ( Design/Draft ) For PT. Rekayasa
Industri-Geothermal plant Project.
- Filtration plant ( Design/Draft ) For PT. Sumatera Timber
- Filtration + Softening plant ( As :Design/Draft ) For PT. Elegant
Textile
- Reverse Osmose plant (As:Design/Draft ) For PT. Essar Indonesia
- Reverse Osmose-Demin plant as: Design/Draft ) For PT. Menamas ( PLTU Medan —Indonesia)
-
Ect.
Make Plant design for Tank, Pressure Vessel & Piping, Support, as per Costumer & contract Project neended. Before Bidding we must
prepare all neended requirement include Plant Drawing Process, Lay out &
Data Material. Preparation for Designed, Drawn material construction like
Vessel, tank, Pipe, Isometric Piping, Support by my self. We will just
supervising for fabrication & Instalation than Testing Comissionin g.
Feb 2005 – Sept 2006 Torishima Guna Engineering
Line Bussiness : Engineering
,Procurement, Contractor for Pump &
Engineering System.
Office : (Jakarta- Bali )
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project;
As : Designer, Drafter &
BOM, BOQ Supervisor for Mechanical
Project.-
( Permanent Contract Status) - Resign
Responsible for direct oversight/management of
project planning, scheduling development and progress control. Review, Design,
Drawing, Estimate, supervise project control for pumping Station such as Water
Level Control (WLC), Coupled Pump with engine & Coupled Pump With Electro
Motor, NPSH, Cavitation , Loss Head.
Client : PT. WASKITA KARYA, ( DSDP )
-AWT
PT. ADHI KARYA, ( DSDP ) -AWT
PT. TOKURA, (
DSDP ) -AWT
PACIFIC CONSULTAN .( DSDP ) -AWT
PU JAKARTA
PU NANGROE ACEH DARUSSALAM
PT. PUSRI – PALEMBANG
PT. MLD ( Mitra Lingkungan
Duta. Consult )
PDAM – JAKARTA
PDAM – KALIMANTAN TIMUR
Project :
- (
Denpasar Sewerage Development Project / DSDP ). 2005 – 2006.
- FIRE PUMP- PLTG GUNUNG MAGANG( Sum – Sel.
- DRAINAGE PUMP PROJECT, TELUK GONG – Jakarta
- DRAINAGE
PUMP PROJECT,
WADUK MELATI- Jakarta
- WATER
THREATMENT PROJECT-KUTAI . Sangatta (
Kalimantan Timur ).
-
WATER THREATMENT PROJECT-Samarinda - Kalimantan
Timur
- FLOOD
CONTROL PUMP PROJECT, MuslimAID- SAUDI ARABIA- Aceh
- Flood Control Pump PANTAI INDAH KAPUK .
-
Etc.
In designing different each project to Promote our
Pump Product for application in Water
system. Design for Denpasar Sewerage
Development Project at Kuta & Sanur for Pumping Station 11 m³/s, 90kW, head 28m &
6.2m³/s,37kW Head 18m complete with wetpit pump installation as Public
sewage collected and Pipeline from wetpit
to Pump station . Selection pump for other application, complete with
Boster tank for storage, jockey pump for fire protection ( NFPA std ).
Supervise while installation for make sure Asbulit Drawing and commissioning
for testing. Application crane for lifting pump in Pump station for service
& remove heavy Weight Equipment. Estimation for Bill of Quantity and Bill
of Material make sure project really cost Sangatta-Ptorject, Samarinda-Project,
to Identify material to installation and erection each process control. To make
design fabrication Pipe non standar larger & tank for reservoir
sangatta-Project & Pantai Indah Kapuk.
Des 2003 – Feb 2005 PT. PIMSF Oil & GAS Division (TJOKRO
GROUP) – INDONESIA
Line Bussiness : Assymbyg,
Repair Service, Product Wellhead Equipment System & Pipework.
Office :
Kapuk-Tangerang ( Indonesia )
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project; Inventor Series 6; Adobe Photoshop
As : Engineering ( Permanent Contract Status)
- Resign
In relation to quality and the Quality System for
direct oversight/management of project planning, scheduling development and
progress control. Review, Design, Drawing, Estimate, supervise project control,
inspected with hardness test, ultrasonic test for testing material and test
assembling report with NACE MR 0175-2002
for corrosive ressistance, API spec 6A, API spec 14D, ASME standard.
Client : PT.
APEXINDO PRATAMA DUTA Tbk (MEDCO) – INDONESIA
PT. DRILLCO
JAYA ABADI
PT. CONOCO PHILLIPS
Project : Wellhead
Equipment (EPC)
Pipeline /Piping
EPC of
fourteen (14) Choke and Kill Manifold, DSA 13 5/8”5M x 7 1/16”3M RTJ,
tubing head, tubing hanger, six (6) BOP test flange complete with skid, six (6)
13 -5/8” 10,000 PSI SL BOP Stack, two (2) complete unit of Koomey BOP control
system as per API standard. Manage the repair of Annular flange and other
wellhead parts as per API standard. As Hydrotest & Gas Test for Leakage
of Control Valve above 10,000 PSI for
Kill & Line Manifold, Elmaoco Brake and Wellhead Equipmet.
Dec 2003 – June 2004 PT. PIMSF (TJOKRO GROUP) – INDONESIA
Line Bussiness : Tank,
Presure Vessel, Construction, Insfrastructure, Assymbling, Repair, Service,
Product Wellhead Equipment System & Pipework/piping.
Office :
Kapuk-Tangerang ( Indonesia )
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project; Inventor Series 6; Adobe Photoshop
As : Engineering Staff ( Planner &
Drafter ) - 6 month Contract Status)
Responsible for direct oversight/management of
project planning, scheduling development and progress control. Review, Design,
Drawing, Estimate, supervise project control, inspected with hardness test,
ultrasonic test for testing material with ,JIS, API, ASME standard and approves
purchase technically. Promote project team’s awareness and importance of
identifying early task slippage and use of the critical path method to gain the
best performance to plan. Identify the change order and prepare the variation
of order for approval.
Client :
PT.
HAMADA
PT. SEAMEC ASIA
PT. IKPT
PT. DIC GRHAPIC
Project : LNG BONTANG TRAIN H,( IKPT)
PDAM Bontang ( Water Treathment Process)
,( ENVITEC)
HAMADA BOILER( PT. Pindo Deli Pulp Paper)
DIC GRAPHIC
EXPANSION PROJECT
Fabricated and various component for mechanical
project, 934 Pipe Support, 4 Water Treathment Proccess Tank, 1 Factory
platform, Resin Tank, Mixer Tank Piping Lay Out design,Factory Expansion,
piping, Coal Fire Boiler.
Sept 2003 - Dec 2003 PT. Hitachi
Construction Machinery Indonesia ( HCMI )
–
INDONESIA
Line Bussiness : Product, Assymbly,
Repair Service, Boiler & Equipment System of Hitachi Boiler.
Office/Workshop : Cibitung
-Bekasi ( Indonesia )
Software Aplication :
AutoCAD 2D/3D, Auto Pipe, MS Project;
As : Boiler Maker &
Material Control - ( Contract Project Status )
Responsible for direct oversight/management of
project planning, scheduling development and progress control. Review instruction , supervise project control, with
ASME VIII Division 1 & 2, ASME IX, & AWS, API and ASTM standard and
approves fabricate technically. Promote project team’s awareness and importance
of identifying early task slippage and use of the critical path method to gain
the best performance to plan. Identify the drawing code (Welding & joint
code), cutting plan material and prepare the Welding Procedure ( WPS, PQR,WPQ
) for approval.
Client :
PT. Rosalia Textindo, Bekasi
Project : Fabrication for Coal fire Boiler 10 TPH
Furnace of boiler, Chimney, Membrane tube, Smoke
tube, Tank , Equipment, thermocouple, air inlet control system as per finish
good complete. Manage the fitt up & joint welding, rolling process, Bending
process of all tubing, wall body tank and adjustable proccess of work allowe
time & target schedule as per Drawing standard. Control to material
handling and pass reposition place with first safety target for man, material,Equipment
& Area (HSE).
May20th 2003 –
August30th 2003 PT. GERBANG SARANA BAJA – INDONESIA
Office/Workshop : Tipar
Cakung-Jakarta Timur ( Indonesia )
Software Aplication :
AutoCAD 2D/3D, MS Project;
As : Forman, QA/ QC ( Contract 1 Year Status )
Manage to
project planning, control material and testing standar approval working
procedure allowable ASME, AWS,API standard. Correction to design actuality on
fabrication process and instructing for
operator in safety Health in working area
Client :
PT. PERTAMINA
PT. REKAYASA INDUSTRI
PT.
YUDISHTIRA HAKA PERKASA
Project : Fabrication
Pressure Vessel/ HeatExcanger
for Mini LPG PLAN Cilamaya, West Java
to fabrication pressure vessel C-300, C400, 3 Steam
Scrubber vessel, stiffener ring, odd
tray, even tray and platform that working pressure 416.6 PSIG allowed system as
per ASME VIII section 2 for fabrication in joint efficiency 100% radiogrhapy.
Manage the body shell tank of pressure vessel with parts as per ASME code and
welding code. As Hydrotest & Leakage of
above 1,000 PSI for all welding joint.
1996 – 1998 As : Field Mechanical
Operator, Pipe Fitter; Formen in any Project ( Status As per Project )
No comments:
Post a Comment